Soil Test Rate

S.L. no

Name of the Work

Unit

Approved  Rate ( TK) excluding Vat

1

Preparation, Packing and Transportation of Drilling

LS

Actual cost

2

Installation of  Drilling Equipment at side

Each site

               3,500.00

3

Installation of water supply arrangement & minor repair

Each site

               2,700.00

4

Setting up temporary accommodation for staff at site

Each site

               2,600.00

5

Execution of boring : (meter[I1] )

 

 

a)   Between 0 m.  to 15 m.

Per  meter

                 230.00

b)   Between 15 m. to 30 m.

Per  meter

                 270.00

c)   Between 30 m. to  45 m.

Per  meter

                 350.00

6

Making platform for execution of Boring in water

Each

 Actual cost

7

Idle time due to non availability of point

Day (8  hrs)

               3,600.00

8

Collection of Disturbed samples at every 1.50 m.

Each

                 135.00

9

Collection of Undisturbed samples by Shelby tube

Each

                 220.00

10

Execution of Standard Penetration Test :

 

 

a)   Between 0 m.  to 15 m.

Per  meter

                   85.00

b)   Between 15 m. to 30 m.

Per  meter

                 120.00

c)   Between 30 m. to 45 m.

Per  meter

                 140.00

11

Cone Penetration Test

 

 

Between 0 m.  to  15 m.

Per meter

               2,200.00

S.L. no

Name of the Work

Unit

Approved  Rate ( TK) excluding Vat

1

Specific Gravity

Each

               1,600.00

2

Natural Moisture Content

Each

                 850.00

3

Visual Inspection and Classification

Each

                 135.00

4

Sieve Analysis

Each

                 850.00

5

Sieve and Hydrometer Combined Analysis (Including Sp.

Each

               2,200.00

6

Unit Weight (Wet & Dry)

Each

               1,650.00

7

In- situ Density Test(Excluding field visit)

Each

               6,500.00

8

Liquid Limit & Plastic Limit

Each

               3,000.00

9

Shrinkage Limit

Each

               1,400.00

10

Porosity, Void Ratio and Degree of Saturation

Each

               2,700.00

11

Unconfined Compressive Test :

 

 

a)   Undisturbed

Each

               3,400.00

b)   Remolded

Each

               2,600.00

12

Compaction Test :

 

 

a)   Standard AASHO

Each

               5,500.00

b)   Modified AASHO

Each

               6,400.00

13

One Dimensional Consolidation (Full)

Each

             13,500.00

14

One Dimensional  Consolidation Test 

 

 

(e-log p)

Each

             11,200.00

15

Direct Shear Test

Each

               4,300.00

16

Tri axial Shear Test :

 

 

a)   Unconsolidated Undrained

Each

             10,500.00

b)   Consolidated Undrained

Each

             14,500.00

c)   Consolidated Drained

Each

               7,200.00

17

Permeability Test

 

 

a)   Cohesive

Each

             11,000.00

b)   Non-cohesive

Each

               5,200.00

18

Differential Swelling Index

Each

               4,500.00

19

Swelling Potential

Each

               8,300.00

20

Preparation of Final Report (Each set of five copies)

Each set

               5,500.00